2021 Ram Build

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

JMay14

Member
Joined
May 3, 2021
Posts
31
Reaction score
5
Location
Flatwoods
Ram Year
2021
Engine
6.7 Cummins SO
Brand new to this forum, so if I am not doing this correctly, please advise me. I ordered a 2021 Ram 3500 Srw Laramie from a dealer in Lexington ky on April 19th. It is currently in D status as of this past Saturday. Has anyone had any luck with the builds coming in on time within the 6-8 week range the dealers give you?


Sent from my iPhone using Tapatalk
 

Trapper1

Member
Joined
Mar 27, 2021
Posts
39
Reaction score
19
Location
ontario
Ram Year
2021
Engine
5.7
I ordered Feb 18/21 . Still in D after 10 weeks. No scheduled build date. So.... there's that. Might be because I ordered regular cab shortbox 4x4, not alot of people ordering these. Have seen some guys on here getting their order within the 8 to ten week timeline. Good luck. Oh, and congrats on the new build.
 
Joined
Apr 7, 2021
Posts
55
Reaction score
51
Location
Maryland
Ram Year
2021
Engine
6.4L
I was also told 6-8 weeks when I ordered a 2021 2500 Big Horn Crew Cab 4x4 17 Feb...it will be 11 weeks as of May 5th...

Window sticker says its build was completed 31 Mar.
22 Apr Dealer says (after I contacted him) it's stuck in Mexico...but it should be delivered by 6 May, yet (after inquiring to Customer Care) RAM says it's in route...and they are looking into it. They say they will provide an update by 10 May.
As you can see, they do not have an accurate means of tracking...or much control, once it goes into the contracted shipping pipeline. Thankfully I have not sold my old pickup. Who's to know when yours will arrive. Good luck on the 6-8 weeks! :)
 

B Mitty

Senior Member
Joined
Nov 11, 2020
Posts
411
Reaction score
463
Location
Halifax
Ram Year
2021 Power Wagon 75th
Engine
6.4L
Lol yea man, I ordered in October, a 4500 and a power wagon 75th. I received the 4500 3 weeks ago, the PW was ordered 2 weeks later and is on a Train now.

just to give you an idea of how long it was for me.
 

RCJeff

Junior Member
Joined
Dec 16, 2020
Posts
14
Reaction score
2
Location
Cincinnati
Ram Year
2021
Engine
6.4L V8
Ordered the same truck as you JMay end of Dec '20. Took one day shy of 16 weeks to hit dealers lot.
 
OP
OP
J

JMay14

Member
Joined
May 3, 2021
Posts
31
Reaction score
5
Location
Flatwoods
Ram Year
2021
Engine
6.7 Cummins SO
Crap, so it sounds like the 6-8 week turnaround that my salesman told me, isn’t gonna play out. He felt pretty confident it would be here in 6 weeks. [emoji2357] I guess I’ll just have to hurry up and wait. Thanks everyone for their reply’s is really appreciate it.


Sent from my iPhone using Tapatalk
 

Southern Ram

Senior Member
Joined
Nov 22, 2020
Posts
763
Reaction score
176
Location
Laplace,LA
Ram Year
2019
Engine
Hemi 5.7
Always plan for it to go longer especially right now with chip shortage.
 
OP
OP
J

JMay14

Member
Joined
May 3, 2021
Posts
31
Reaction score
5
Location
Flatwoods
Ram Year
2021
Engine
6.7 Cummins SO
I just received a text from my salesman saying that my 2021 ram 3500 Laramie was now in D1 status. Anyone know how long it will sit in this status before it actually get the physical build process going?


Sent from my iPhone using Tapatalk
 

GTyankee

Senior Member
Supporting Member
Military
Joined
Nov 2, 2020
Posts
10,117
Reaction score
12,719
Location
El Cajon Calif. 92021
Ram Year
2016
Engine
3.0 ecodiesel
D1 means that all the parts to build it are in Inventory
It also means that a date & time has been set to begin building your Ram.

Once that date arrives, it will take about 16 hours to build it

Then it is scheduled to go to the Body Vendor for a few days for things like bed liner, hitch receiver, side steps, etc.

Then it will go back to the assembly line property to get signed off & scheduling for shipment

Your Ram is going to be built down in Saltillo Mexico

Normally from the time that you placed the order, until you take delivery, when it is a Mexico build, is about 12 weeks, but if you live in some place like Nova Scotia or Vancouver, it will take longer than that

The shortest destination would be Dallas/ Ft. Worth
 

Pudge

Senior Member
Joined
Oct 14, 2013
Posts
432
Reaction score
692
Location
Alberta, Canada
Ram Year
2021 Power Wagon 75th
Engine
Hemi 6.4
My Power Wagon is also coming from Mexico. Ordered Feb 3, So 13+ weeks ago. Sat in D status for 12 weeks, then boom. In the past three days it’s gone from D to D1 status to shipped. Dealer said it’s about 3 weeks away from their door.
 
OP
OP
J

JMay14

Member
Joined
May 3, 2021
Posts
31
Reaction score
5
Location
Flatwoods
Ram Year
2021
Engine
6.7 Cummins SO
D1 means that all the parts to build it are in Inventory
It also means that a date & time has been set to begin building your Ram.

Once that date arrives, it will take about 16 hours to build it

Then it is scheduled to go to the Body Vendor for a few days for things like bed liner, hitch receiver, side steps, etc.

Then it will go back to the assembly line property to get signed off & scheduling for shipment

Your Ram is going to be built down in Saltillo Mexico

Normally from the time that you placed the order, until you take delivery, when it is a Mexico build, is about 12 weeks, but if you live in some place like Nova Scotia or Vancouver, it will take longer than that

The shortest destination would be Dallas/ Ft. Worth

Yeah, looks like my dealers thoughts of a 6-8 week turnaround is gonna fall well short. From what I am seeing on these forums, I need to plan on the 11-12 week mark. I didn’t opt to get any side steps or Bed liner to maybe speed up the process. Hoping it would not cause any delays. My dealership that I ordered from is in Lexington Kentucky, so I am assuming it will take that much longer to get here from Mexico. Thanks GTyankee for the info.


Sent from my iPhone using Tapatalk
 
OP
OP
J

JMay14

Member
Joined
May 3, 2021
Posts
31
Reaction score
5
Location
Flatwoods
Ram Year
2021
Engine
6.7 Cummins SO
My Power Wagon is also coming from Mexico. Ordered Feb 3, So 13+ weeks ago. Sat in D status for 12 weeks, then boom. In the past three days it’s gone from D to D1 status to shipped. Dealer said it’s about 3 weeks away from their door.

So you didn’t get any updates once it was in D1? Like any if the paint codes or frame code etc?


Sent from my iPhone using Tapatalk
 

Pudge

Senior Member
Joined
Oct 14, 2013
Posts
432
Reaction score
692
Location
Alberta, Canada
Ram Year
2021 Power Wagon 75th
Engine
Hemi 6.4
So you didn’t get any updates once it was in D1? Like any if the paint codes or frame code etc?


Sent from my iPhone using Tapatalk

No, it was in D status Tuesday and then dealer called yesterday to tell me it’s shipped. They think the updates don’t happen like they should, but I don’t know. I don’t think they know much. What I’ve been doing is running the build sheet and it kept coming up not found, but all of a sudden on Monday it generated for me. Then I started ruining the window sticker and it was not coming up until yesterday morning. I think the build sheet gets generated after it’s built, and the window sticker gets generated after it’s sent to the shipping yards. At least, that’s what I’ve gathered from other threads. And it might be correct because the dealer called yesterday to tell me it’s on it’s way.
 
OP
OP
J

JMay14

Member
Joined
May 3, 2021
Posts
31
Reaction score
5
Location
Flatwoods
Ram Year
2021
Engine
6.7 Cummins SO
No, it was in D status Tuesday and then dealer called yesterday to tell me it’s shipped. They think the updates don’t happen like they should, but I don’t know. I don’t think they know much. What I’ve been doing is running the build sheet and it kept coming up not found, but all of a sudden on Monday it generated for me. Then I started ruining the window sticker and it was not coming up until yesterday morning. I think the build sheet gets generated after it’s built, and the window sticker gets generated after it’s sent to the shipping yards. At least, that’s what I’ve gathered from other threads. And it might be correct because the dealer called yesterday to tell me it’s on it’s way.

Ok Gotcha... I hate there is no way of tracking these builds any better. When my mother ordered her bmw in 2015, they even emailed her picture of the cargo ship that it was on and updates twice a week. I sure wish ram would do the same. Also, you mentioned running the build sheet but it was coming up not found... what exactly was you running? What does running the build sheet mean exactly if you wouldn’t care to tell me.


Sent from my iPhone using Tapatalk
 
Top