Build Times?

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

Aero_Dave

Junior Member
Joined
Feb 9, 2018
Posts
7
Reaction score
2
Location
Boston
Ram Year
2015
Engine
Cummins 6.7
So, I just ordered a 22 Longhorn Limited 3500 Dually LB. She’s loaded with just about every option. How long do you actually think the build time will be? I’m being told 3-4 months but I expect more like 5-6! Just hoping to have by mid-June which is around the timeframe I’m hoping our newly ordered 5th-Wheel will get built. Ordered a new 22 Riverstone Legacy 391FSK.

Dave…
 

audiophile

Senior Member
Joined
Aug 13, 2015
Posts
1,037
Reaction score
1,106
Ram Year
2016
Engine
5.7L
Right now it is hard to tell but we give our customers a 6-8 month expectation.
 
OP
OP
A

Aero_Dave

Junior Member
Joined
Feb 9, 2018
Posts
7
Reaction score
2
Location
Boston
Ram Year
2015
Engine
Cummins 6.7
Right now it is hard to tell but we give our customers a 6-8 month expectation.
OUCH. I hopes it’s sooner than that. It’s got the HO 6.7 & it’s a Dually too so I’m hoping they are still building these HD’s during the summer?

Dave…
 

audiophile

Senior Member
Joined
Aug 13, 2015
Posts
1,037
Reaction score
1,106
Ram Year
2016
Engine
5.7L
OUCH. I hopes it’s sooner than that. It’s got the HO 6.7 & it’s a Dually too so I’m hoping they are still building these HD’s during the summer?

Dave…
They are, we just delivered a limited in granite crystal with the night package and HO/Aisin combo. Don't know how long ago it was ordered. Sold orders get priority over stock units.
 

GTyankee

Senior Member
Joined
Nov 2, 2020
Posts
12,391
Reaction score
17,459
Location
El Cajon Calif. 92021
Ram Year
2016
Engine
3.0 ecodiesel
You may not know if it will take 2 1/2 or 4 months to be built
But once it is on the freight train in Saltillo Mexico, the train goes into Local Mode, it stops at several places before it gets to the US Border at Eagle Pass Mexico.
Then it speeds up & goes to Chicago, then i think CSX RR hooks up to your freight car & pulls it to somewhere near Boston, where it is unloaded & a car hauler takes it to your dealership
 
OP
OP
A

Aero_Dave

Junior Member
Joined
Feb 9, 2018
Posts
7
Reaction score
2
Location
Boston
Ram Year
2015
Engine
Cummins 6.7
I have my VIN & VON #'s. Anyway online to track my status on where I'm in the production line?

Thanks,
Dave...
 

RAM331

Junior Member
Joined
Jan 19, 2019
Posts
12
Reaction score
5
Location
Los Angeles
Ram Year
2021
Engine
Hemi 5.7
I just need a front bumper and have been waiting 2 months now. lol
 

Keep_it_fair

Junior Member
Joined
Mar 8, 2022
Posts
3
Reaction score
0
Location
92596
Ram Year
2022
Engine
Diesel HO
I'm kinda in the same boat. I ordered Feb 5 2022. Pretty much the same truck. I was emailed the vin# Feb 17. My salesman was pretty honest up front. He said not to hold my breath, it could be 4 months to 6 months. I see as, I've been without a diesel my whole life. What's 6 more months.20220319_153731.jpg
 

GTyankee

Senior Member
Joined
Nov 2, 2020
Posts
12,391
Reaction score
17,459
Location
El Cajon Calif. 92021
Ram Year
2016
Engine
3.0 ecodiesel

Keep_it_fair

That paper is called a Priced Order Confirmation

Your Ram 3500 will be built in Saltillo Mexico

Your current Status is BA = Pending Order

Likely by Monday it will change to Status C & possibly ever D

Status C = Order Confirmed
Status D = means that they are checking their inventory for all the parts to build your Ram

Limited Level 1 Equipment Group
&
Trailer Surround View Camera System

May slow your build a bit
 

Keep_it_fair

Junior Member
Joined
Mar 8, 2022
Posts
3
Reaction score
0
Location
92596
Ram Year
2022
Engine
Diesel HO
Thank you for the info. Wish I would've come across this forum before i ordered. There's a lot of helpful tips here. But in my mind I'm thinking 8 to 10 months or longer. So I'll get my new 2022 ram when the 2023 comes out.
 

GTyankee

Senior Member
Joined
Nov 2, 2020
Posts
12,391
Reaction score
17,459
Location
El Cajon Calif. 92021
Ram Year
2016
Engine
3.0 ecodiesel
Normally before this Covid crisis,
Chrysler has considered a Production year as July 1 through June 30th
With the first new vehicles being at Auto Shows in mid September

They don't always make those dates, but they attempt to come as close as possible
 
Back
Top