SPDKLZ
Member
- Joined
- Feb 3, 2015
- Posts
- 57
- Reaction score
- 5
- Ram Year
- 2015 Limited Mega Cab
- Engine
- 6.4 Hemi
I ordered a Granite 2500 Mega Limited 4x4 with the 6.4 and a few other goodies on Jan 21st. I was told about four weeks for delivery.
On Feb 4th I got a print out from dealer saying it would be ready for pick up on the 9th. I was surprised, but sold my Titan within a day and waited...and waited. No truck so I made a tiny hiss about it and they put me in a new loaner 1500 QC.
Checked back a couple of weeks ago and they said about two more weeks and it would be here (this week). Well, I just called them and again was told that it was still at the rail yard storage and "looks like it is about two weeks out". Tomorrow will make it six weeks. I am racking up the miles on their loaner so they asked that I go swap it out for another one.
I am appreciative of being able to use the loaner, but I want MY truck already. Ugh. I was thinking four weeks to build, but realistically thought six....had no idea it would be eight or more.
On Feb 4th I got a print out from dealer saying it would be ready for pick up on the 9th. I was surprised, but sold my Titan within a day and waited...and waited. No truck so I made a tiny hiss about it and they put me in a new loaner 1500 QC.
Checked back a couple of weeks ago and they said about two more weeks and it would be here (this week). Well, I just called them and again was told that it was still at the rail yard storage and "looks like it is about two weeks out". Tomorrow will make it six weeks. I am racking up the miles on their loaner so they asked that I go swap it out for another one.
I am appreciative of being able to use the loaner, but I want MY truck already. Ugh. I was thinking four weeks to build, but realistically thought six....had no idea it would be eight or more.
