Chicken smasher
Junior Member
The tailgate recall pays the tech 12 minutes and 18 minutes with the reprogram the pcm for the shifter recall. If the panel on the tailgate has spray in bed liner covering the torks tip screws it may take that long. A wise tech will do them at the same time. Providing the department isnt busy you should be in and out quick. Our shop is less busy after lunch. My 2 cents. Personnal I can knock out the tailgate in about 3 minutes. The reflash is the only real time consumer.