I ordered a 3500 2/5/2022. Just wondering if I'll see it this year?

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

Keep_it_fair

Junior Member
Joined
Mar 8, 2022
Posts
3
Reaction score
0
Location
92596
Ram Year
2022
Engine
Diesel HO
Wish I would've read the forum before I ordered. Then from reading all these post, I'm realizing I messed up ordering almost every option. Especially the sunroof. I didn't ordered Night Edition package because i usually remove all the emblems anyways.
Although, my salesman was pretty up front about the wait time. He said 4 months. Now from reading all this, I'm thinking end of the year if I'm lucky.
Ordered Feb-5-22
Got my vin Feb-2-17
3C63RRRL9NG269130
Could someone help find out the status of the build? Thanks in advance.
 

Attachments

  • 20220319_153731.jpg
    20220319_153731.jpg
    77.2 KB · Views: 25

68PowerWagon

Senior Member
Joined
Nov 26, 2015
Posts
1,666
Reaction score
976
Location
Dayton, Ohio
Ram Year
2022 Laramie 3500
Engine
6.7 CTD
Time line I am hearing is more like 14-16 weeks. Maybe 12 if you ordered a Tradesman. Don't beat yourself up over it. The whole reason you ordered is so you can get everything you want. Your dealer should be able to tell you when it goes into D1 status & then tell you when it is being built. After that I am hearing it's at least another 2 weeks for shipping. I ordered mine 1/31/22 and was just put into D1 Status last week. I would imagine they will be building it in the next week or two.
 

turkeybird56

Military Vet 1976-1996 Retired US Army
Military
Joined
Aug 2, 2018
Posts
19,060
Reaction score
43,562
Location
Central Texas
Ram Year
2019 Bighorn, 4 X 4, 3.21 rear, Bright Flame Red Pearl Coat, Mopar tonneau cover,Westin Bed rug
Engine
Hemi 5.7
U might have to break out this Special Piece of Equipment to assist you with your time line: :anitoof: Good Luck.

8 ball.JPG
 

mtnrider

Senior Member
Joined
Sep 25, 2014
Posts
3,185
Reaction score
3,441
Location
Georgia
Ram Year
2016
Engine
6.7 Cummins
Contact Ramchat with you VIN for status on your build. As far as when it will be done? That crystal ball is going to be you best bet, really depends on the options etc.

.
 

matemike

Member
Joined
Oct 10, 2021
Posts
66
Reaction score
17
Location
Texas
It really is a mind boggling thing to try and figure out. I ordered a 2500 Laramie with Night edition and Hemi a week before with Christmas 2021. It has been built and passed QC inspections since March 5th of this year. So that part only took 77 days (11 weeks). It is not a heavily option truck; being that I did not get any of the towing or safety tech groups. No sunroof. I did however get the cargo camera and the digital rear view mirror with camera, and I got power running boards. Otherwise, rather plain compared to some. Still waiting on a train ride from Mexico to Louisiana.

It was estimated 16-20 weeks for final delivery when I ordered it.
Dec 18 + 20 weeks = May 7th. So that is still possible. It could be delivered before then.

What's mind boggling is to see other's orders with all the tech groups and 5th wheel prep and sunroofs and literally EVERYTHING possible to click get built in a month, then delivered in less than a month after that. Nobody can figure it out. Especially frustrating if your truck is sitting there, ordered since December, then someone who ordered mid January has been driving around in their new heavier optioned truck since last week. I get a lot of this info from HDrams.com

particularly this thread :


Even though I still don't have my truck, I'm not out of the estimated time frame, and I keep telling myself once I get, I willl have it for good. All this waiting will be over soon.
 

Billet Bee

Senior Member
Joined
Jan 4, 2021
Posts
454
Reaction score
343
Location
South Dakota
Ram Year
2020
Engine
Cummins 6.7 HOHD
Doesn't sound lije6
It really is a mind boggling thing to try and figure out. I ordered a 2500 Laramie with Night edition and Hemi a week before with Christmas 2021. It has been built and passed QC inspections since March 5th of this year. So that part only took 77 days (11 weeks). It is not a heavily option truck; being that I did not get any of the towing or safety tech groups. No sunroof. I did however get the cargo camera and the digital rear view mirror with camera, and I got power running boards. Otherwise, rather plain compared to some. Still waiting on a train ride from Mexico to Louisiana.

It was estimated 16-20 weeks for final delivery when I ordered it.
Dec 18 + 20 weeks = May 7th. So that is still possible. It could be delivered before then.

What's mind boggling is to see other's orders with all the tech groups and 5th wheel prep and sunroofs and literally EVERYTHING possible to click get built in a month, then delivered in less than a month after that. Nobody can figure it out. Especially frustrating if your truck is sitting there, ordered since December, then someone who ordered mid January has been driving around in their new heavier optioned truck since last week. I get a lot of this info from HDrams.com

particularly this thread :


Even though I still don't have my truck, I'm not out of the estimated time frame, and I keep telling myself once I get, I willl have it for good. All this waiting will be over soon.
Things haven't changed much since my 20 model build. It was built in no time flat then sat in a storage lot waiting inspection for 2.5 months. The 1 good thing about it was I convinced myself that I didn't mind waiting the extra time since it was pulled for any extra inspection process by qc, id rather wait and have it arrive correct and without issue.
Ps: ask my buddy brutal when is he going to allow me (Rich) back on the hdrams forum? Its been 2 years now and i think I've learned my lesson. That was my favorite group of folks and platform hands down. Maybe you can pull some strings for me to get me a second chance. He'll know who I am.
Tyvm if you do Decide to ask him for me.
 

thkbaron

Senior Member
Joined
Dec 12, 2019
Posts
1,449
Reaction score
802
Location
Minnesota
Ram Year
2018
Engine
6.4 Hemi
The cummins is taking a bit but at the end of the day you ordered what you want. If you didn't order what you want because you thought it might take longer then you shouldn't have ordered. A co worker just got a laramie cummins with similar options and his took 6 months.
 

P B Casterlin

Member
Joined
Mar 12, 2021
Posts
73
Reaction score
47
Location
NEPA
Ram Year
2019 3500 Dually
Engine
6.7 Cummins HO
I ordered a 2022 3500 Tradesman Dually HO diesel on March 17th, I had my VIN on the 21st. Now it's just the waiting game. My salesman said to expect 4 months.
 

Moltroub

Junior Member
Joined
Mar 7, 2022
Posts
4
Reaction score
3
Location
NC
Ram Year
2021
Engine
Hemi 6.4
Reach out to your dealer. The Sales manager was excellent at sending emails about our 2021 2500HD.
 

Jayco

Junior Member
Joined
Aug 24, 2019
Posts
4
Reaction score
2
Location
Port Huron Mi
Ram Year
2018 2500
Engine
6.4 gas
I keep seeing the contact Ramchat reply…. How do I do this? Little help please, getting really frustrated, been at D status since December 2021 And know nothing.
 

JoeCo

Senior Member
Joined
Mar 5, 2014
Posts
2,465
Reaction score
2,019
Location
NY
Ram Year
2021
Engine
5.7
I keep seeing the contact Ramchat reply…. How do I do this? Little help please, getting really frustrated, been at D status since December 2021 And know nothing.


Click that link and there is a chat option to select. I wouldn't get my hopes up though, they don't give out much information other than what seem to be automated responses for the most part.
 

G rams

Junior Member
Joined
Feb 25, 2022
Posts
14
Reaction score
1
Location
Ontario Canada
Ram Year
2022
Engine
Cummins
Wish I would've read the forum before I ordered. Then from reading all these post, I'm realizing I messed up ordering almost every option. Especially the sunroof. I didn't ordered Night Edition package because i usually remove all the emblems anyways.
Although, my salesman was pretty up front about the wait time. He said 4 months. Now from reading all this, I'm thinking end of the year if I'm lucky.
Ordered Feb-5-22
Got my vin Feb-2-17
3C63RRRL9NG269130
Could someone help find out the status of the build? Thanks in advance.
The dealership ordered my 3500 in October and it arrived on the lot in January.View attachment 490308
Wow ordered ours Sept 13, 2021 still no word from dealer....getting tired of waiting.
 

KoboldTaco

Senior Member
Supporting Member
Joined
Mar 6, 2022
Posts
418
Reaction score
533
Location
Los Angeles
Ram Year
2022
Engine
Cummins 6.7L
Wow ordered ours Sept 13, 2021 still no word from dealer....getting tired of waiting.
Wow - this and other folks waiting long times I don’t get the reason but also demand they show you the order. Did they really order it? I have a friend who ordered a luxury car (a different brand) and their dealer keeps playing games. My ram dealer showed me the status of my truck. Ordered Feb 28, well optioned. D1 status last week and ship date of 5/5. Fingers crossed also but I feel mine is moving fairly fast. And I ordered all of the scary delay things except the sunroof.

Good luck.
 

G rams

Junior Member
Joined
Feb 25, 2022
Posts
14
Reaction score
1
Location
Ontario Canada
Ram Year
2022
Engine
Cummins
Thank you. We phone twice a month, the dealer says they cannot provide us with anything. Just says that order went in Sept 13, 2021. We are in Ontario
Canada and therefore are not issued VIN. I have reached out to Ram Canada, they cannot help. I have reached out to Stellantis North America
no help from them either. I am wondering if it is because we are Canadian? I see orders from before and months after our order on the HD Ram Tracker
page that have been delivered and these are all trucks going to dealers in the United States. So so frustrating.
 