Some updates as well as a change my wife made to the wall insulation. So she met with our guys at the shop and they ended up not liking the 19 in the walls because with the spaces and having no vertical beams the bats would have to much sag. So the new plan is filling the small space between 2 x 6's with R-8 horizontally so its flush, then putting R-19 over the top of that going vertically and using glue and stick pins to keep them together with the FSK pulled tight over the top. They all agreed it would keep my heat in better as well as look better. The rest is the same and insulation will be done Sunday, at least the doors and walls I'm not sure if our spray foam guy will be done or not.
Update is more electrical has been done as well as man door installed and roll ups and side motors all installed and finished. Three of the lights are going to have to be moved now because the tracks for the roll ups will hit them lol think that's it so far, but we are moving again